Soil Health - Sediment - Implement cover crops, no-till, and/or low-till management techniques to improve soil health and increase water storage capacity of soils.
Storage - Sediment - Implement practices such as grassed waterways, wetland restoration, and water and sediment control basins to store and slow down the flow of water.
Slope Stabilization - Sediment - Implement slope stabilization and riparian buffer practices in high slop areas to address soil loss and slow overland runoff.
Manure & Septic Management - Bacteria - Implement appropriate combination of education, inspections, BMP construction, and upgrades with individual producers and owners.
Subwatershed Size:
30,286 acres
Upstream Subwatersheds:
Willow Creek (8931 acres)
Judicial Ditch No. 20A (18,8478 acres
Counties:
56% Redwood
44% Murray
Cities:
Walnut Grove
Major Waterbodies:
Plum Creek
Judicial Ditch No. 28
Lake Laura
Elevation Change:
Maximum Elevation: 1,511 ft.
Minimum Elevation: 1,075 ft.
Longitudinal Barriers:
1 Significant Barrier
2 Partial/Seasonal Barriers
This grant is intended to provide a minimum of 15% to be added to federal 319 funds (60%) awarded specifically to this watershed. A larger cost-share percentage may be used as long as a 25% match (federal and local funds) is achieved by end of the grant.
Goal: 1,470 tons/year of sediment removed
Current: 1,262.90 tons/year
Match Required: $100,201.25
Match To Date: $319,980.84
Grant Amount = $ 400,805.00
Total Project Costs = $ 909,363.76
CWF Grant Expended = $ 190,627.41
Landowner Match Provided = $ 319,980.84
Federal 319 Funds = $ 692,071.62
Federal EQIP Funds = $ 17,861.01
Acre-Feet of Storage Created = 83.828
Tons/Year of Sediment Removed = 1,262.90